"Hobby Master" sent up a drone and took this video of construction at the Miller-Driscoll School, which it posted on YouTube.

Current construction includes pouring of concrete foundations, erection of structural steel, puring the slab in the pre-K wing, relocating an access road, installing water, gas, electrical and IT conduits from Wolfpit Road

The Miller-Driscoll Building Committee meets tonight, March 24, at 5 p.m., at the Wilton High School Library Mezzanine.